说明:最全专利文库
BSEN 61400-25-5:2017 Bsl Standards Publication Wind energy generation systems Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing bsi. BSEN61400-25-5:2017 BRITISH STANDARD National foreword This British Standard is theUK implementationof EN61400-25-5:2017 ItisidenticaltoIEC61400-25-5:2017.Itsupersedes BS EN 61400-25-5:2007, which is withdrawn. TheUKparticipationinitspreparationwas entrusted to Technical Committee PEL/88,Windturbines. A list oforganizations represented on this committee can be obtained on requestto its secretary. This publication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. @ The British Standards Institution 2018 Published by BSI Standards Limited 2018 ISBN9780580955372 ICS 27.180 Compliance with a British Standard cannot confer immunity from legal obligations. This British Standard was published under the authority of the Amendments/corrigendaissuedsincepublication Date Text affected BSEN61400-25-5:2017 EUROPEANSTANDARD EN 61400-25-5 NORMEEUROPEENNE EUROPAISCHENORM December2017 ICS 27.180 Supersedes EN 61400-25-5:2007 English Version Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing (IEC61400-25-5:2017) Windenergieanlagen - Teil 25-5: Kommunikation fur die Systemes de production d'énergie eolienne - Partie 25-5: Communications pour la surveillance et la commande des Uberwachung und Steuerung von Windenergieanlagen - centrales éoliennes - Essais de conformite Konformitatsprufungen (IEC 61400-25-5:2017) (IEC 61400-25-5:2017) This European Standard was approved by CENELEC on 2017-10-25. CENELEC members are bound to comply with the CEN/CENELEC Intemal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Gemany, Greece, Hungary, iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. CENELEC European Committee for Electrotechnical Standardization Comite Europeen de Normalisation Electrotechnique Europaisches Komiteefir Elektrotechnische Normung CEN-CENELEC Management Centre:Rue dela Science 23, B-1040 Brussels @ 2017 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members. Ref. No.EN 61400-25-5:2017 E

.pdf文档 IEC 61400-25-5 2017 Wind energy generation systems - Part 25-5 Communications for monitoring and control of wind power plants - Compliance testing

文档预览
中文文档 62 页 50 下载 1000 浏览 0 评论 309 收藏 3.0分
温馨提示:本文档共62页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
IEC 61400-25-5 2017 Wind energy generation systems - Part 25-5 Communications for monitoring and control of wind power plants - Compliance testing  第 1 页 IEC 61400-25-5 2017 Wind energy generation systems - Part 25-5 Communications for monitoring and control of wind power plants - Compliance testing  第 2 页 IEC 61400-25-5 2017 Wind energy generation systems - Part 25-5 Communications for monitoring and control of wind power plants - Compliance testing  第 3 页
下载文档到电脑,方便使用
本文档由 人生无常 于 2025-03-22 11:31:52上传分享
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。